<< Click to Display Table of Contents >> Schedule Icons |
The following sections provide information on Schedule icons:
The following table provides information on the schedule triggers and settings available on the Schedule Window > Triggers tab.
Schedule Trigger |
Icon |
Details |
|
The type of schedule. Various settings are available on the schedule detail page to the right, depending on the schedule trigger. |
|
This schedule runs once in the future. •Trigger Enabled: Enables the schedule trigger for use (selected by default). •Trigger On: Select one time date. •At: Time •Description: (Optional) Description of the schedule. |
||
Runs (and repeats) at a set time interval. •Trigger Enabled: Enables the schedule trigger for use (selected by default). •Every: Select schedule interval by day, hour, and minute. •Starting: Select first run date. •At: Time •Ending: Date that the schedule ends. •At: Time •Description: (Optional) Description of the schedule. |
||
Runs every day at the same time. •Trigger Enabled: Enables the schedule trigger for use (selected by default). •Every Day •At: Time •Starting: Date that the schedule starts. •Ending: (Optional) Date that the schedule ends. Select to enable the end date. •Description: (Optional) Description of the schedule. |
||
Runs every week at the same time on selected days of the week. •Trigger Enabled: Enables the schedule trigger for use (selected by default). •Every Week •On: Day or Days that the schedule runs. •At: Time •Starting: Date that the schedule starts. •Ending: (Optional) Date that the schedule ends. Select to enable the end date. •Description: (Optional) Description of the schedule. |
||
Runs every month at the same time on selected days. •Trigger Enabled: Enables the schedule trigger for use (selected by default). •Every Month •On Day: The day (or multiple days) of the month (for example, 1st, 12th, 23rd, etc.) Or •On The: The nth (for example, 1st, 2nd, Last, etc.) day of the month (for example, All, Weekend Days, Sunday, Monday, etc.) TIP: Days of Month: If you select the 29th, 30th, or 31st of the month, the schedule won't run in months without those days. Use Last to always run on the last day of the month. Can be mixed with Weeks of the Month. TIP: Weeks of Month: Different combinations of weeks and days require separate schedules (for example, the 1st Monday and the 2nd Friday.) Selecting the 5th week won't deploy in a month without a fifth week. Use Last to always run on the last week of the month. Can be mixed with Days of the Month. •At: Time •Starting: Date that the schedule starts. •Ending: (Optional) Date that the schedule ends. Select to enable the end date. •Description: (Optional) Description of the schedule. |
||
Deploys to target computers when their status changes from Offline to Online in PDQ Inventory. (Requires Pro or Enterprise mode in both PDQ Deploy and PDQ Inventory.) For more information, see Deploying When Target Computers Come Online with Heartbeat Schedules. •Trigger Enabled: Enables the schedule trigger for use (selected by default). •Starting: Date that the schedule starts. •At: Time •Ending: (Optional) Date that the schedule ends. Select to enable the end date. •At: Time •Description: (Optional) Description of the schedule. |
When you disable a schedule its icon changes. The table below explains the possible states of a schedule and the related icons.
State |
Icon |
Description |
Enabled |
Schedule is enabled and configured, ready to run using the configured trigger. |
|
Disabled |
Schedule is fully configured but disabled by user. |
|
Not Configured |
Schedule is not fully configured. Triggers, targets, or packages are disabled or not attached. |
See also:
© 2017 PDQ.com Corporation. All rights reserved.
PDQ.com is a trademark of PDQ.com Corporation. All other product and company names are the property of their respective owners.
Help Version: 13.1.0.0